Explore our project experience.

Browse demolition and environmental work by capability, market, and location.

Clear
11 projects
Select Demo excavator processing concrete debris at South Station with the terminal and downtown Boston behind.
Selective & Interior Demolition

South Station

Boston, Massachusetts

Phased structural and selective demolition inside an active rail and bus terminal for Suffolk Construction.

Select Demo wheeled excavator on the Maffa Way bridge deck during the closure, with the Schrafft Center behind.
Highway & Marine Demolition

Maffa Way / Mystic Avenue Bridges

Boston and Somerville, Massachusetts

Two-phase superstructure and substructure removal with asbestos abatement over the MBTA Orange Line for Skanska.

Riggers in a suspended basket cutting the CITGO sign support steel with the crane hook above and Kenmore Square below.
Selective & Interior Demolition

Boston CITGO Sign

Kenmore Square, Boston, Massachusetts

Sectional dismantling of the landmark sign and its steel support structure with a 500-ton crane for Suffolk Construction.

Two Select Demo high-reach excavators with shear attachments processing steel from the UMass Boston science building.
Structural Demolition

UMass Boston Science Center, Pool & Plaza

Boston, Massachusetts

Complete take-down and abatement of an 800,000 SF, 100-foot science building, pool building, plaza, and garage on an active campus.

High-reach excavator removing the upper floors of the five-story MathWorks building, with a second excavator processing at grade.
Structural Demolition

MathWorks Lakeside Campus Expansion

Natick, Massachusetts

Complete demolition of a five-story, 125,000 SF office building and asbestos abatement on an active corporate campus for Consigli.

Excavator breaking out an exterior concrete stair at the Bradley terminal with the glass enclosure above.
Selective & Interior Demolition

Bradley International Airport Vertical Circulation

Windsor Locks, Connecticut

Multi-phase selective demolition inside an active airport terminal, performed on third shift for Suffolk Construction.

Excavator with hydraulic breaker removing a bridge deck on I-95 in Medway, Maine, under a clear sky.
Highway & Marine Demolition

MaineDOT I-95 Bridges, Medway

Medway, Maine

Concrete deck and substructure removal on multiple I-95 bridges, including the Vaughn Daggett Bridges over the Penobscot River.

Select Demo excavator and skid steer clearing the Davenport Cancer Center site beside the occupied Cape Cod Hospital tower.
Structural Demolition

Cape Cod Hospital, Davenport Cancer Center

Hyannis, Massachusetts

Building take-down, separation from an active hospital, and removal of two concrete radiation vaults for Suffolk Construction.

Saw-cut slab openings protected by yellow guardrail inside Vivarium Hall during selective demolition.
Selective & Interior Demolition

Yale University Vivarium Hall

New Haven, Connecticut

Selective demolition of 48,000 SF across three floors, with lead and asbestos abatement, for Consigli.

Full-floor asbestos containment with negative air ducting and sealed window openings in the Saltonstall Building.
Environmental Remediation & Abatement

Medford Housing Authority, Saltonstall Building

Medford, Massachusetts

Asbestos abatement phased over 34 months in a partially occupied 11-story, 200-unit public housing building for Consigli.

Full-height poly containment inside the Cannon Street power plant beneath the overhead crane rail.
Structural Demolition

Sprague Energy Cannon Street Power Plant

New Bedford, Massachusetts

Structural demolition, asbestos abatement, PCB remediation, and hazardous-material decontamination of a 255,000 SF power plant.

Have a scope to discuss?

Tell us where the project is, what needs to be done, and when you expect to begin.