Excavator with hydraulic breaker removing a bridge deck on I-95 in Medway, Maine, under a clear sky.

Medway, Maine

MaineDOT I-95 Bridges, Medway

Concrete deck and substructure removal on multiple I-95 bridges, including the Vaughn Daggett Bridges over the Penobscot River.

Overview

Select Demo was contracted by New England Infrastructure to perform concrete deck and substructure removal on multiple bridges along the I-95 corridor in Medway, Maine, as part of the Maine Department of Transportation's Initiative for New Decks Essential for Economic Development.

Scope

  • Deck removal at Route 157 over I-95
  • Deck removal at the Vaughn Daggett Bridges carrying I-95 northbound and southbound over the Penobscot River
  • Deck removal at the I-95 northbound and southbound bridges over Route 116
  • Substructure removal

Approach

Decks were saw-cut and broken out by excavator over the steel girders, with staged traffic shifts maintaining interstate operations. Hand demolition with hydraulic breakers cleared concrete around bearings and at girder flanges.

On site