Select Demo high-reach excavator processing structural steel at UMass Boston with the campus behind.

Market

Academic

Campus work means working around the academic calendar, student housing, research continuity, and institutional review. Select has removed an 800,000 SF science building at UMass Boston and gutted laboratory floors at Yale while adjacent buildings stayed in use.

The environment

What governs the work

  • Occupied residence halls, classrooms, and laboratories adjacent to work
  • Summer and break-period schedule windows
  • Building separation from structures that remain
  • Institutional sustainability and diversion reporting

Our practice

How Select responds

  • Phasing aligned to the academic calendar
  • Engineered shoring where plazas and garages cannot carry loads
  • On-site crushing of brick, concrete, and CMU for reuse as backfill

Have a scope to discuss?

Tell us where the project is, what needs to be done, and when you expect to begin.