Maffa Way / Mystic Avenue Bridges
Boston and Somerville, MassachusettsTwo-phase superstructure and substructure removal with asbestos abatement over the MBTA Orange Line for Skanska.

Boston CITGO Sign
Kenmore Square, Boston, MassachusettsSectional dismantling of the landmark sign and its steel support structure with a 500-ton crane for Suffolk Construction.

UMass Boston Science Center, Pool & Plaza
Boston, MassachusettsComplete take-down and abatement of an 800,000 SF, 100-foot science building, pool building, plaza, and garage on an active campus.

MathWorks Lakeside Campus Expansion
Natick, MassachusettsComplete demolition of a five-story, 125,000 SF office building and asbestos abatement on an active corporate campus for Consigli.

Cape Cod Hospital, Davenport Cancer Center
Hyannis, MassachusettsBuilding take-down, separation from an active hospital, and removal of two concrete radiation vaults for Suffolk Construction.

Yale University Vivarium Hall
New Haven, ConnecticutSelective demolition of 48,000 SF across three floors, with lead and asbestos abatement, for Consigli.

Medford Housing Authority, Saltonstall Building
Medford, MassachusettsAsbestos abatement phased over 34 months in a partially occupied 11-story, 200-unit public housing building for Consigli.

Sprague Energy Cannon Street Power Plant
New Bedford, MassachusettsStructural demolition, asbestos abatement, PCB remediation, and hazardous-material decontamination of a 255,000 SF power plant.